KAHRAMAA QATAR REGULATIONS PDF

L O D = Qatar General Electricity & Water Corporation . KAHRAMAA hereby certifies that the WORK under the said CONTRACT has been. State of Qatar Qatar General Electricity and Water Corporation “KAHRAMAA” Regulations for the Installation of Electrical Wiring, Electrical EquipmentAnd Air. Any deviation to this regulation to be noticed to the Qatar General Electricity & Water Corporation “KAHRAMAA” by the contractor or consultant. These.

Author: Akinojas Mar
Country: Timor Leste
Language: English (Spanish)
Genre: Software
Published (Last): 27 November 2015
Pages: 83
PDF File Size: 3.5 Mb
ePub File Size: 11.65 Mb
ISBN: 583-8-35964-581-2
Downloads: 73074
Price: Free* [*Free Regsitration Required]
Uploader: Vujinn

Every item shall be packed individually and put into the wooden box, which shall be close and open type. If the head loss per kilometer for a Aerators shall be installed with conventional faucets and taps in bathrooms and kitchen of all private and public buildings.

Means constructed void underground to accommodate electronic sensor connected to the GRP bulk meter cabinet by 2 inches conducts for the sensor cord to the EDU Electronic Display Unit. Main Water Meter Cabinet: Means the level at which the water in a cistern or vessel will first spill over if the inflow exceeds the outflow through any outlet and any overflow pipe.

The following words and expressions shall have the meanings assigned to them in this document. Means the part of pipes and fittings between the distribution main up to and including the water meter at the customer’s boundary.

Means the capacity of the cistern or tank measured to the highest level that water can reach when the float valve or other approved device for controlling the inflow of water fitted.

Means those individual meters down stream of the main meter or sub main through which conveyed water to flats or villa in building or complex. Study permit applications maintenance of the buildings and the issuance of Permit.

Regulations of Internal Water Installations and Connection Works

These clauses shall be read in continuation with Section 7. No discernible pattern in rainfall occurrence is apparent, but there is a tendency of rainfall to occur more often during February and March. The PWA is responsible for all public foul sewerage, surface water and ground water drainage systems in the State of Qatar. Means any device other than a regulatioons off tap, for stopping the flow of water in a pipe. Study temporary license applications and issuing Permit.

  JOB SATISFACTION HOPPOCK PDF

Pipes shall have blue stripe to distinguish potable water.

Means a fixed container for holding water at atmospheric pressure like tanks, sectional panel GRP tank or concrete tank. In designing plumbing systems, utilize new techniques and options that can lead to maximum water efficiency. Approved Contractors List 8 Nos. The applicant must have a valid ISO certificate. Rainfall can be heavy with poor natural drainage resulting in surface flooding. Building Permit Complex Centre, Tel.

A house connection is defined as the connection from a development comprising domestic, commercial, industrial, institutional premises, etc to transfer foul flows to the public sewerage system. The valve shall close clockwise.

Detail data of all Fuel System Equipments 6. Governmental building and establishment Non Investment regulationns, private establishment for the general benefit, clubs, federations and waqf buildings.

Means meter device allocated for measuring consumption for allocated group of premises on specific distribution network or tanks serving particular area. The guidelines that must be considered while designing the plumbing system for new and addition to existing buildings by all consultants, customers and developers, are as follow: The regulations presented in this document form part of the requirements for water services connection and installation.

Individual water meter is required for fire system at the upstream, if separate water tank is required. Comparison of Pipe Carrying Capacities.

These standards have a set of specification for the materials usage. Fire System In Multistory Buildings: The washers shall be of EPDM and shall provide the sealing between the outer body and the ferrule stem. Guideline for Plans Submission.

If there is combine tanks supplying fire, irrigation, or both, allusiveness both domestic and fire demand must be qqatar by consultant at the relevant form see appendix form BPW. Documents Flashcards Grammar checker. Detail drawings of the Fuel System 5.

  FRAKTUR IMPRESI PDF

Means a cistern provided with kahramaw discharging apparatus for discharging the stored water rapidly into a water closet pan, urinal, drain or sewer. Copy of commercial registration with activity approved by SSD.

Regulations of Internal Water Installations and Connection Works

Collection of fees fees to open a file, Permit fees. Study permit applications small additions and Permit. The sizing of the internal water main Network inside the said villa compound must be determined during the initial design stage, drawings to be submitted at the BP stage for evaluation, the internal net sizing needs to sufficient to kqhramaa water to the scattered premises to meet their needs.

Pump installation at the downstream Outlet Discharge Point From That Tank with non return valve One Directional Valve that convey water to the roof storage tank of public house, villas or building roof tank.

In the case of large supplies, where E coil thermo tolerant coli form bacteria sufficient sample examined, must not be Total coli form bacteria.

A separate water tank is required with flow meter. In the case of combined water tanks, allowance during the design calculation to include the required water demand for fire with the domestic water demand and others. Full proposed design details including; Architectural, Location plan, Structural plans, Sections and Elevations with QND 95 levels noted on all drawing, including the loading design regylations foundation details. The designer has to select suitable water booster pump with sufficient total head to regulaions for head loss due to premises height.

Detailed drawing of cameras locations for each floor.